Under the supervision of Kyle, several loads of road bed material has been laid to improved access to the community septic pumps, chambers, mounds and controls system in the field on the common grounds area West of the housing.
Big savings!Mowing around the mounds instead of bushogging has begun resulting in a better appearance, increase in savings and healthier mound system.
Marked improvements - reduced cost - healthier systemBids are being taken for the repair of the entrance sign. Bricks have loosened and general deterioration occured to the brick and block sign over time caused by weathering.
Preserving our assets